Resources

Installation Guide

Our end-to-end installation process — from site survey to go-live. Every Wintek deployment follows this 6-step process.

01

Site Survey & Planning

Before any hardware ships, our team conducts a site survey — power points, network connectivity, mounting wall structure, ambient light levels, and viewing distance are all documented.

  • Electrical load assessment
  • Network CAT6/Wi-Fi coverage check
  • Structural wall/ceiling load review
  • Viewing angle & distance mapping
02

Hardware Delivery & Staging

All hardware is pre-staged and tested at our warehouse before dispatch — displays are powered on, media players are pre-loaded with CMS credentials, and network config is pre-set.

  • Pre-staging and burn-in testing
  • CMS agent pre-installation
  • Network config pre-loaded
  • Labelled per location/screen ID
03

Physical Installation

Our certified installation team handles all mounting, cabling, and power. We use concealed cable runs where possible and ensure VESA-compliant mounting on all surfaces.

  • VESA-compliant wall/ceiling mounting
  • Concealed cable management
  • Power + data cabling by certified team
  • Anti-tip and safety anchor for kiosks
04

CMS Setup & Network Configuration

After physical installation, every screen is registered in Wintek CMS, assigned to its location group, and tested with live content before handover.

  • Screen registration & naming
  • Content group assignment
  • Scheduling configuration
  • Remote monitoring enabled
05

Content Upload & Go-Live

Your initial content library is uploaded, scheduled, and pushed to all screens. We verify playback on every screen before signing off on the installation.

  • Content format optimisation
  • Schedule configuration
  • Live playback verification
  • Proof-of-play baseline recording
06

Handover & Training

We conduct a 2-hour CMS training session with your team — covering content upload, scheduling, screen monitoring, and how to raise support tickets.

  • CMS admin training (2 hours)
  • Content upload walkthrough
  • Support escalation process
  • Documentation handover pack

Download Setup Guides

PDF guides for self-managed installations and IT teams.

Media Player Setup Guide

Connecting and configuring Wintek media players with CMS.

6 pages

Request PDF

Samsung Smart Signage Setup

Registering Samsung Tizen displays with Wintek CMS.

8 pages

Request PDF

LED Panel Assembly Guide

Cabinet assembly, power wiring, and signal chain for LED panels.

12 pages

Request PDF

CMS Quick Start Guide

Uploading content, creating playlists, and scheduling for new users.

10 pages

Request PDF

Network Configuration Guide

Firewall rules, ports, and proxy settings for Wintek CMS.

6 pages

Request PDF

Troubleshooting Guide

Common issues and resolutions — no-signal, offline screens, content errors.

8 pages

Request PDF

Need professional installation?

Our certified team installs across 40+ Indian cities — contact us for a site survey and quote.

Book a Site Survey

Ready to transform your displays?